NHAN PHONG THAI CO.,LTD
161/28/21 Binh Tri Dong,
Binh Tri Dong A Ward,
Binh Tan Dist, .HCM City 
Tel: +84-949820279
Email: info.nptgroup@gmail.com

Tiếng Việt English Spain
CATEGORY
SEARCH
SUPPORT ONLINE
Skype Me™!
SUPPORT
WEBSITE LINKS
TOOLS
Gold
Rate
Weather
Securities
STATISTICS
Visitors: 107069
Online:


» Project » Executed projects
LOCAL ROAD RECONSTRUCTION

  

Scope of work:

Reconstruction of local road.

Description:

-       Supply Carboncor Asphalt.

-       Construction of Roads.

Place of construction:

Tien Thang Drives Test Center.

No.E 4/52, National No.1 Road, Binh Tri Dong B Ward, Binh Tan District, HCMC, VN.

Job schedule:

Have done since October, 2012.

 
» FRP LINING FOR CHEMICAL TANKS AREA   » SEPTIC TANK SYSTEM
» AIRLOCK VALVE CAPACITY 5M3/H   » WASTEWATER TREATMENT SYSTEM 6M3/DAY
» CHEMICAL PRODUCTION SYSTEM   » OIL SKIMMER (BALL FLOAT TYPE) – CAPACITY 4-6 M3/Hr
» CLEAN WATER SUPPLY SYSTEM – CAPACITY 1-5 M3/Hr   » DRINKING WATER TREATMENT SYSTEM 500L/H
» SEWAGE TREATMENT PLANT TAKIGAWA   » LONG CHAU CO., LTD FACTORY RECONSTRUCTION

Copyright © 2010 NPT Group. Designed & Developed by Trajan JSC